五岳抽水蓄能电站利用已有水库的实践 被引量:2

Practice of the Utilization of Existing Reservoir in Wuyue Pumped Storage Power Station
下载PDF
导出
摘要 河南五岳抽水蓄能电站利用已建的五岳水库作为下水库,在抽水蓄能电站可行性研究阶段,根据水库的实际运行情况及监测资料,全面评估除险加固的效果,经对水库饮用水源区进行有效保护、汛期防洪的优化调度及灌溉渠道防渗等工程措施,避免饮用水污染、占用灌溉水源,充分利用水库汛期弃水作为电站取水,为工程顺利获得核准批复和开工建设,奠定了坚实的基础。 In Wuyue Pumped Storage Power Station,the existing Wuyue Reservoir is used as the lower reservoir.Several important issues in the feasibility study of the project are discussed,including the reinforcement of the original reservoir,drinking water source protection,flood control dispatching and agricultural irrigation water occupying compensation.Detailed measures are then proposed such as effective protection of the drinking water source area,optimized flood control dispatching scheme,seepage control work of irrigation channels,and the utilization of the abandoned water of the reservoir in flood season for power generation.It provides solid basis for the approval and construction of the project.
作者 潘军伟 许志卫 PAN Junwei;XU Zhiwei(Henan Xinhua Wuyue Pumped Storage Power Generation Co., Ltd., Guangshan 465450, China)
出处 《水电与新能源》 2020年第6期55-56,共2页 Hydropower and New Energy
关键词 抽水蓄能电站 租赁协议 防洪调度 已有水库利用 pumped storage power station lease agreement flood control dispatching utilization of existing reservoir
  • 相关文献

参考文献3

二级参考文献10

共引文献9

同被引文献15

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部