基于Petri网的项目外包实施流程建模与优化 被引量:1

Process Modeling and Optimization of Project Outsourcing Based on Petri Net
下载PDF
导出
摘要 项目实施是外包行业的重要组成部分,在整个项目的上线过程中起着重要的作用。目前已经存在大量的完整的项目实施流程,但这些业务流程存在着一些缺陷,无法适应不同客户对项目接受能力的差异,培训实际消耗时间与预期时间不一致,影响项目实施进度等问题。为了解决这一问题,利用Petri网对项目实施流程进行建模和分析,给出了优化的项目实施流程模型。优化后的模型缩短了项目实施周期,改善了项目外包的实施流程。 Project implementation is an important part of outsourcing industry and plays an important role in the whole process of project on-line.At present,there are a large number of complete project implementation processes,but there are some defects in these business processes,which cannot adapt to the differences in project acceptance ability of different customers,the inconsistency between actual training consumption time and expected time,and affect the project implementation schedule.In order to solve this problem,the project implementation process was modeled and analyzed with Petri net,and the optimized project implementation process model was given.The optimized model shortens the project implementation cycle and improves the project implementation process.
作者 周衍志 ZHOU Yan-zhi(School of Mathematics and Big Data, Anhui University of Science and Technology, Huainan Anhui 232001,China)
出处 《佳木斯大学学报(自然科学版)》 CAS 2020年第3期29-32,共4页 Journal of Jiamusi University:Natural Science Edition
基金 国家自然科学基金项目(61572035) 安徽省自然科学基金(1508085MF111) 安徽省大数据产业集聚基地项目(2017BD032) 安徽省教育厅重点项目(KJ2016A208) 安徽理工大学研究生创新基金项目(2019CX2068)等资助。
关键词 PETRI网 项目实施 流程建模 优化 Petri net project implementation process modeling optimization
  • 相关文献

参考文献4

二级参考文献36

  • 1谢波,卫斌,李利军.基于工作流技术的项目管理系统研究[J].计算机与数字工程,2004,32(6):98-101. 被引量:5
  • 2张益林,王如龙.基于WEB的工作流技术在工程项目管理系统中的实现[J].科学技术与工程,2005,5(6):371-374. 被引量:18
  • 3Lin Chang,Qu Yang. Temporal Inference of Workflow Systems Based on Time Petri Nets:Quantitative and Qualitative hnalysis. International Journal of Intelligent Svstems.2004.19(5):417-442.
  • 4WMP Vander halst, The Application of Petri Nets to Workflow Management, The Journal of Circuits,Systems,and Computers,1998,8(1):21-66.
  • 5WMP Vander halst. Interorganizational work-flows:An approach based on message sequence charts and Petri nets. System Analysis and Modeling,1999, 34(3):335-367.
  • 6James S. ,Pennypacker,Kevin P. Grant. Project Management Maturity:An Industry Benchmark. Project Management Journal,2003,(33):4-14.
  • 7Steve Fahrenkrog,Claudia M Baca,Lisa Marie Kruszewski,Paul R. Wesma. Project Management In-stitute's Organizational Project Management Maturity Model (OPM3). PMI Global Congress Europe, 2003.
  • 8Ben Voivedich,Milt Jones. Developing and Applying A Project Management Capability MaturityModel. Proceedings of the Project Management Institute Annual Seminars & Symposium, 2001,11, Nashville,Tenn. ,USA.
  • 9吴哲辉.Petri网理论[M].北京:机械工业出版社,2006.
  • 10PETRI C A. Konmmunkation mit automaten [ C ]. Bonn English translation, Communication with Automata, 1966.

共引文献7

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部