摘要
既有站场改造是一项技术比较复杂的施工,本文以太原北站Ⅵ场枢纽站场改造过渡施工为例,阐述了站场改造过渡方案的制定、站场改造过渡中各专业相互配合、方案指导实践过程。从施工前图纸核对与现场调查、施工方案制定要点、施工准备的重要性、方案的实施难点为论文梗概,对如何实现站场改造过渡施工,总结出站场改造过渡方案制定以运输为主线的原则,对站场过渡方案从不同的角度进行分析,对方案进行比对从中找出最优,对方案组织落实实施周密布置,以期达到拓展思路的目的。
Renovation of an existing station is a more technically complex construction.This article takes the construction of the transition reconstruction of the Taiyuan North StationⅥhub station as an example to explain the formulation of the transformation plan of the station,the cooperation between the majors in the transformation of the station,and the practice process of the program guidance.From the pre-construction drawings verification and on-site investigation,the key points of the construction plan,the importance of construction preparation,and the difficulties in the implementation of the plan,this paper summarizes the principle of formulating the transition plan for station transformation and formulating the main line of transportation,analyzes the transition plan of the station from different perspectives,compares the plans to find the best,and organizes and implements the layout of the plan in order to achieve the purpose of expanding ideas.
作者
陈祥龙
CHEN Xiang-long(China Railway Sixth Group Taiyuan Railway Construction Co.,Ltd.,Taiyuan 030013,China)
出处
《价值工程》
2020年第18期124-126,共3页
Value Engineering
关键词
铁路站改
方案制定
方案实施
railway station reform
plan formulation
plan implementation