摘要 德尔西水电站通过调整、优化设计方案,将调压井和压力管道竖井合并布置,采用快速正井法施工工艺进行竖井开挖和支护,采用滑模工艺施工衬砌混凝土,有效缩短了压力管道的工期,施工过程顺利,达到了预期目的,取得了良好的工程效益,是一次成功的探索和实践。 By adjusting and optimizing the design plan,DELSITANISAGUA Hydropower Project has merged the surge tank and the vertical shaft.The Down-Excavating construction method is used for the vertical shaft excavation and support.The sliding lining process is used to construct the lining concrete,which significantly cuts down the construction period of the pressure piping.The construction which achieved the expected purpose and favorable engineering benefits was a successful practice and exploration.
作者 师广山 张帆 王旭辉 SHI Guangshan;ZHANG Fan;WANG Xuhui(PowerChina Northwest Engineering Corporation Limited, Xi' an 710065,China)
出处 《西北水电》 2020年第3期67-69,共3页 Northwest Hydropower
关键词 正井法 调压井 竖井 合并布置 Down-Excavating construction surge tank shaft combined arrangement
  • 相关文献

同被引文献40

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部