摘要 传统GM(1,1)模型在工程变形预测中受到众多不确定性因素的影响,会导致预测精度低、残差大。因此,文中对传统GM(1,1)中原始数据、初始值、以及背景值进行改进。最后以某大坝边坡监测点的沉降位移为例,分别用两种模型对该监测点位移进行拟合预测并与实际值比较。结果表明:改进模型精度优于传统模型,预测值更接近真实值,在实际工程中有更好的应用价值。 Traditional GM(1,1)model was affected by many uncertain factors in engineering deformation prediction,which would lead to the low prediction accuracy and the large residual.Therefore,in this paper,the original data,initial value and background value of traditional GM(1,1)were improved.Finally,taking the settlement displacement of a dam slope monitoring point as an example,two models were used to fit and predict the displacement of the monitoring point and compare with the actual value.The results showed that the precision of the improved model was better than that of the traditional model,and the predicted value was closer to the real value,which had better application value in practical engineering.
作者 杨静 汪坚明 汪尧峰 Yang Jing;Wang Jianming;Wang Yaofeng(Research and Design Institute of China Hydropower Eighth Engineering Bureau Co.,Ltd.,Changsha 410000,China;Zhejiang Guangsheng Environmental Construction Group Co.,Ltd.,Zhoushan 316000,China;Zhoushan Marine Survey and Design Institute,Zhoushan 316021,China)
出处 《矿山测量》 2020年第3期41-44,49,共5页 Mine Surveying
关键词 GM(1 1) 改进模型 变形预测 沉降位移 GM(1 1) improve model deformation prediction settlement displacement
  • 相关文献

参考文献9

二级参考文献67

共引文献114

同被引文献35

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部