摘要 500 kV电网作为主要的骨干型网架得到了广泛应用,但仍存在许多问题,需要不断统筹相关资源,进一步研究变电站综合自动化改造的可行性。变电站综合自动化改造工作涉及的范围较广,同时面临施工时间较长、施工现场安全风险系数高等困难。因此,将以此作为切入点,简单阐述变电站综合自动化改造工作中存在的问题,提出相关的改造建议,以供借鉴。 The 500kV power grid has been widely used as the main backbone network frame,and there are still many problems.It is necessary to continuously coordinate the relevant resources and further study the feasibility of the comprehensive automation transformation of substations.Because of the wide range involved in the comprehensive automation transformation work of substations,but also facing the difficulties of long construction time and high safety risk factor on the construction site,this paper will be used as an entry point,briefly expounded the problems in the comprehensive automation transformation work of substations,and put forward relevant transformation suggestions for reference.
作者 张一 ZHANG Yi(Zhongshan Power Supply Bureau,Guangdong Power Grid Co.,Ltd.,Zhongshan 528400,China)
出处 《通信电源技术》 2020年第8期232-233,共2页 Telecom Power Technology
关键词 变电站 综合自动化 改造 substation comprehensive automation transformation
  • 相关文献

参考文献4

二级参考文献18

共引文献8

同被引文献9

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部