不同寒冷地区地铁车站混凝土冬季施工保温技术 被引量:4

Insulation technology of subway station concrete construction in winter in different cold areas
下载PDF
导出
摘要 针对高寒地区混凝土冬季施工容易遇到冻害的问题,结合哈尔滨地铁2号线省政府站的工程案例,对该站混凝土冬季施工的保温技术进行详细介绍,主要包括混凝土施工的温度控制技术、自限温电伴热带加热技术,以及利用热的不良导体珍珠岩来隔断寒冷空气的保温技术。通过不同的环境温度对施工区域进一步划分,并且根据所划分的区域采取不同的保温技术,精准施工,降低施工成本。 In view of the problem that concrete construction is easy to encounter frost damage in winter in the frigid area,combined with the project case of Harbin Metro Line 2 provincial government station,this paper introduces the insulation technology of concrete construction in winter in detail,mainly including the temperature control technology of concrete construction,the heating technology of self limited temperature electric tracing band,and the insulation technology that uses the poor conductor perlite to block the cold air technology.In addition,the construction area is divided into different areas by different ambient temperatures,and different insulation technologies are adopted for different areas to accurately construct and reduce construction costs.
作者 王宇声 李丹 WANG Yusheng;LI Dan(Power China Railway Construction Co.,Ltd,Harbin 150076,China)
出处 《中国高新科技》 2020年第10期64-66,共3页
关键词 地铁车站 高寒地区 冬季施工 混凝土保温技术 subway station frigid zone winter construction concrete insulation technology
  • 相关文献

参考文献5

二级参考文献27

共引文献14

同被引文献13

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部