摘要
中交集团南方总部基地B区项目施工中使用到人工挖孔灌注桩,文章根据该项目施工的特点及重难点提出相适应的人工挖孔桩施工质量控制措施,从而保证工程的整体质量。
Manually excavated cast-in-situ piles are used in the construction of the CCCC Group South Headquarters Base B project.According to the construction characteristics and difficulties of the project,the article puts forward appropriate construction quality control measures for artificial excavated piles to ensure the overall quality of the project.
作者
赵东
ZHAO Dong(Zhuhai Engineering Co.Ltd,CCCC Fourth Harbor,Zhuhai 519000,China)
关键词
基坑工程
人工挖孔桩
质量控制
foundation pit engineering
artificial digging pile
quality control