水电移民山区长距离供水工程管线设计 被引量:2

Design of Long-distance Water Supply Pipelines for Hydropower Resettlement in Mountainous Area
下载PDF
导出
摘要 水电移民安置点生活供水工程多处在山区,地形地质条件复杂,重力输水工程设计存在管径偏大、虹吸等诸多问题。以苗尾水电站迁建集镇为例,从设计思路、管道布置、水力计算、水锤防护等方面对山区长距离输水工程设计要点进行了详细介绍。 The water supply project for the residential area of hydropower resettlement is mostly in mountainous area.As the complex topographic and geological conditions,the design of gravity water conveyance project has some problems such as large pipe diameter,siphon and others.Combining with the relocation project construction of Miaowei Hydropower Station,the design of long-distance water supply project in mountainous area is introduced from the aspects of design idea,pipeline layout,hydraulic calculation and water hammer control.
作者 王永才 朱如龙 朱耿军 舒高华 WANG Yongcai;ZHU Rulong;ZHU Gengjun;SHU Gaohua(PowerChina Huadong Engineering Corporation Limited,Hangzhou 311122,Zhejiang,China;China Three Gorges Corporation,Chengdu 610041,Sichuan,China)
出处 《水力发电》 北大核心 2020年第7期71-73,共3页 Water Power
关键词 山区 长距离 输水工程 管线设计 水电移民 mountain area long distance water supply project pipeline design hydropower resettlement
  • 相关文献

参考文献2

二级参考文献7

  • 1刘梅清,孙兰凤,周龙才,徐元利.长管道泵系统中空气阀的水锤防护特性模拟[J].武汉大学学报(工学版),2004,37(5):23-27. 被引量:63
  • 2杨开林,石维新.南水北调北京段输水系统水力瞬变的控制[J].水利学报,2005,36(10):1176-1182. 被引量:30
  • 3刘梅清,冯卫民,刘志勇,等.江西省九江市第三水厂水源泵站水锤计算分析及防护技术研究[R].武汉:武汉大学,2000.
  • 4刘志勇,熊晓明,王晶,等.内蒙古达拉特电厂供水系统加压泵站输水管线爆管事故分析及防护措施研究报告[R].武汉:武汉大学,2005.
  • 5Wylie E B, Streeter V L, Suo Liseng. Fluid transient in systems [M]. Englewood Cliffs, New Jersey:Prentice Hall, 1993.
  • 6GB/T50265-97.泵站设计规范[S].[S].,..
  • 7CECS193:2005城镇供水长距离输水管(渠)道工程技术规程.

共引文献47

同被引文献16

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部