曲线部分斜拉桥宽幅箱梁施工阶段剪力滞效应研究

Shear lag effect research of the wide box girder of a curve extradosed cablestayed bridge in construction stage
下载PDF
导出
摘要 以国内第一座3跨曲线部分斜拉桥—龙井河大桥为工程背景,采用自行开发的桥梁空间实体单元有限元分析软件,建立了该桥施工阶段空间实体有限元模型,分析研究了曲线部分斜拉桥箱梁在施工阶段典型截面的剪力滞效应和受力特性,总结了其分布特征。 Longjing River Bridge is the first three-span curved cable-stayed bridge,is used as the engineering background.We established the finite element analysis model of the space entity of the whole bridge by using the self-developed finite element analysis software and studied the shear lag effect and force characteristics of the typical section of the curved cable-stayed box girder in the construction stage.The distribution characteristics are summarized.
作者 郭祥伟 GUO Xiang-wei(Xi’an Highway Research Institute,Shaanxi Xi’an 710065 China)
机构地区 西安公路研究院
出处 《山东交通科技》 2020年第2期70-74,86,共6页
关键词 曲线部分斜拉桥 空间有限元法 施工阶段 剪力滞效应 curve extradosed cable-stayed bridge space finite element method construction stage shear lag effect
  • 相关文献

参考文献7

二级参考文献26

共引文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部