基于BIM技术的跨黄河栈桥施工技术研究 被引量:1

Research on construction technology of Yellow River trestle bridge based on BIM technology
下载PDF
导出
摘要 济南凤凰路北延工程跨越黄河栈桥施工,采用常规履带式起重机进行悬臂施工,配合导向架精确定位,施工方便,比传统施工方法更切合实际情况。通过BIM建模,模拟整个栈桥施工过程,指导施工机械及工作人员正确操作,提高了效率,缩短了施工工期。 In the text,the north extension project of Fenghuang road in Jinan spans the Yellow River trestle bridge.A conventional crawler crane is used for cantilever construction.With the accurate positioning of the guide frame,the construction is convenient and more practical than traditional construction methods.Through BIM modeling,the entire trestle bridge construction process is simulated,and the construction machinery and staff are guided to operate correctly,which improves efficiency and shortens the construction period.
作者 朱玉涛 张炜 王可尧 ZHU Yu-tao;ZHANG Wei;WANG Ke-yao(Jinan Traffic Engineering Quality Supervision Station,Shandong Jinan 250102 China)
出处 《山东交通科技》 2020年第2期112-114,共3页
关键词 栈桥 浅水域 悬臂施工 BIM 导向架 trestle shallow waters cantilever construction BIM guide frame
  • 相关文献

参考文献1

二级参考文献5

共引文献40

同被引文献13

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部