一种框架-核心筒结构体系施工全过程结构分析简化算法 被引量:1

A Simplified Algorithm for Structural Analysis of Whole Construction Process of Frame-core Tube Structure System
下载PDF
导出
摘要 针对框架核心筒结构体系超高层结构施工阶段分析常规数值计算方法所面临的模型体量巨大、计算速度慢、建模修改耗时巨大等问题,提出了一种采用梁单元模拟核心筒的新的简化算法。该方法能在很大程度上相对减少模型单元数目,实现计算速度快、模型修改而导致的反复计算耗时少,准确计算核心筒因混凝土收缩、徐变引起的竖向变形,其最终目的能够在整个施工阶段,快速有效地预测结构标高及构件内力变化,确定各施工阶段结构标高的补偿量,从而为工程设计和施工提供参考。 In view of the problems faced in the analysis of conventional numerical calculation methods for the super high-rise structure of the frame-core tube structure system during the construction stage,such as the huge volume of the model,the slow calculation speed,and great time-consuming of the model modification,a new simplified algorithm is proposed to simulate the core tube with the beam element.This method can greatly reduce the number of model elements,realize fast calculation speed,reduce the repeated calculation time caused by model modification,and accurately calculate the vertical deformation of the core tube due to concrete shrinkage and creep.The final purpose of this method is to quickly and effectively predict the change of structural elevation and internal force of components,and determine the amount of compensation for structural elevations in each construction stage,So as to provide reference for engineering design and construction.
作者 李怀翠 LI Huaicui(Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)
出处 《建筑施工》 2020年第6期973-976,共4页 Building Construction
基金 上海市科学技术委员会资助项目(16DZ1200200)。
关键词 框架-核心筒 超高层建筑 施工全过程 有限单元法 frame-core tube super high-rise building whole construction process finite element method
  • 相关文献

参考文献5

二级参考文献33

  • 1王晓蓓,高振锋,伍小平,吕佳,夏飞.上海中心大厦结构长期竖向变形分析[J].建筑结构学报,2015,36(6):108-116. 被引量:18
  • 2Bazant Z P, Baweja S. Creep and shrinkage prediction model for analysis and design of concrete structures: model B3 [ J ]. Materials and Structures, 1995, 28 (6) : 357-365.
  • 3宋滕添玛沙帝结构师事务所,同济大学建筑设计研究院(集团)有限公司.上海中心大厦项目结构超限审查报告[R].上海:同济大学建筑设计研究院(集团)有限公司,2009..
  • 4JGJ3-2002.高层建筑混凝土结构技术规程[S].[S].,..
  • 5Azuma Y. Ito M, Harada Y, et al. Low-intensity pulsed ultrasound accelerates rat femoral fracture healing by acting on the various cellular reactions in the fracture callus. J Bone Miner Res 2001; 16:671-80
  • 6PeeyushChowdhary,Ravi K.Sharma.Evaluation of creep and shrinkage effects in composite tall buildings[J]. Struct. Design Tall Spec. Build. . 2011 (7)
  • 7Han‐Soo Kim,Se‐Hun Jeong,Seung‐Hak Shin.Column shortening analysis of tall buildings with lumped construction sequences[J]. Struct. Design Tall Spec. Build. . 2010 (10)
  • 8HansooKim,SukheeCho.Column shortening of concrete cores and composite columns in a tall building[J]. Struct. Design Tall Spec. Build. . 2005 (2)
  • 9Cargnino Alberto,Debernardi Pier Giorgio,Guiglia Matteo,Taliano Maurizio.Axial Shortening Compensation Strategies in Tall Buildings. A Case Study: The New Piedmont Government Office Tower. Structural Engineer . 2012
  • 10Comite Euro-International Du Beton.CEB-FIP Model Code1990. Journal of Women s Health . 1993

共引文献36

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部