期刊文献+

BIM虚拟施工技术在装配式钢结构桥梁中的应用研究 被引量:13

Research on Application of BIM Virtual Construction Technology in Prefabricated Steel Bridge
下载PDF
导出
摘要 为进一步提高建筑信息模型(BIM)技术在桥梁工程领域的应用,提高施工效率,阐述了装配式钢结构桥梁在工程应用中的优势,结合BIM可视化分析平台,提出并采用Revit+Fuzor模式构建适用于桥梁结构的可视化施工模拟体系的一般方法。以某4跨钢结构连续梁桥实际工程为实例,归纳总结其建造装配过程、关键施工工序、机械设备作业情况等施工模拟方法。在虚拟建造过程中,采用Revit软件创建桥梁模型,Fuzor模拟施工,该模式可将模拟输出的成果应用于实际施工管理中,实现对施工过程的动态管控。 In order to improve the application of BIM technology in the field of bridge engineering and improve construction efficiency.First,the paper discusses the advantages of prefabricated steel structure bridges in engineering applications.Combined with the BIM visual analysis platform,a general method for constructing a visual construction simulation system suitable for bridge structures is proposed and adopted by Revit+Fuzor mode.Finally,based on the actual project of a 4-span steel structure bridge,the construction and assembly process,key construction procedures,and mechanical equipment operation conditions are summarized.In the virtual construction process,revit software is used to create a bridge model,and Fuzo simulates the construction.This mode can apply the results of the simulation output to the actual construction management to achieve dynamic control of the construction process.
作者 王占飞 冯瑾 梁伟 张强 孙宝芸 WANG Zhan-fei;FENG Jin;LIANG Wei;ZHANG Qiang;SUN Bao-yun(School of Traffic Engineering,Shenyang Jianzhu University,Shenyang 110168,China)
出处 《北方交通》 2020年第7期9-13,共5页 Northern Communications
关键词 BIM 虚拟施工 钢结构桥墩 可视化 BIM Virtual construction Steel pier Visualization
  • 相关文献

参考文献7

二级参考文献58

  • 1李惠,欧进萍.智能混凝土与结构[J].工程力学,2007,24(z2):45-61. 被引量:29
  • 2张劲泉,李万恒,程寿山,李湛.基于检测结果的既有桥梁承载能力评定方法研究[J].公路交通科技,2006,23(S1):30-32. 被引量:29
  • 3张昆.基于BIM应用的软件集成研究[J].土木建筑工程信息技术,2011,3(1):37-42. 被引量:28
  • 4吕志涛.高性能材料FRP应用与结构工程创新[J].建筑科学与工程学报,2005,22(1):1-5. 被引量:81
  • 5陈明宪.斜拉桥的发展与展望[J].中外公路,2006,26(4):76-86. 被引量:46
  • 6Huang T, Kong C W, Guo H L, Baldwin A, Li H. A virtual prototyping system for simulating construction processes [J]. Automation in Construction, 2007, 16( 5 ): 576-585.
  • 7Li H, Huang T, Kong C W, Guo H L, Baldwin A, Chan N, Wong J. Integrating design and construction through virttial prototyping[J]. Automation in Construction, 2008, 17 ( 8): 915-922.
  • 8Li H, GUO H L, Skibniewski M J, Skitmore M. Using the IKEA model and Virtual Prototyping technology to improve construction process management[J]. Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.
  • 9Li H, Guo H L, Skitmore M, Huang T, Chan N, Chan G. Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong[J]. Construction Management and Economics, 2011, 29 ( 3 ): 233-245.
  • 10Guo H L, Li H, Skitmore M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, ASCE, 2010, 26 (1): 41 47.

共引文献416

同被引文献57

引证文献13

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部