摘要
本文主要针对炼油总承包项目的特点,重点对炼油工程实施之前的承包单位进行合同费控管理策划准备的重要环节进行分析,主要包括针对炼油承包合同的梳理,施工招标和合同计算价格模式的制定策划,施工招标文件的制作与细节的梳理、谈判、签订,建立项目费控文件体系和制定项目最初的预算,为炼油总承包项目的合同费控管理提供一些有效的数据以作参考.
This article mainly focuses on the characteristics of oil refining general contracting projects,focusing on the analysis of the important links in the preparation of contract cost control management planning for the contractors before the implementation of oil refining projects,mainly including the sorting out of oil refining contract,the formulation and planning of construction bidding and contract calculation price mode,the sorting,negotiation and signing of the production and details of construction bidding documents.Establish the document system of project cost control and make the initial budget of the project,and provide some effective data for the contract cost control management of oil refining EPC project for reference.
作者
王明哲
刘明杰
Wang Mingzhe;Liu Mingjie(CNPC East China Design Institute Co.,Ltd.,Shandong,266000)
出处
《当代化工研究》
2020年第12期167-168,共2页
Modern Chemical Research
关键词
炼油
承包项目
费用管理
策划准备
费控文件体系
refining
contracting project
cost management
planning preparation
cost control document system