期刊文献+

黄河三角洲工程防护区海床侵蚀过程与不稳定性评估 被引量:3

Seabed Erosion Process and Instability Assessment in the Engineering Protection Zone of the Yellow River Delta
下载PDF
导出
摘要 近年来受入海水沙减少、海岸带高强度开发和海洋动力作用等的影响,黄河三角洲近岸海床侵蚀凸显。基于实测地形和波浪资料,研究了黄河三角洲工程防护区海床侵蚀过程及稳定性变化。工程防护区海床侵蚀主要分布在近岸10 km内,2007-2015年距岸8 km区域内表现强烈侵蚀,堤前海床较2000-2007年时段侵蚀量增大,海床侵蚀向岸加剧。随着现行河口沙嘴的淤积延伸和孤东浅水区的不断侵蚀,孤东南大堤外海逐渐形成了"近岸区深,远岸区浅"的反剖面形态。随着工程防护区近岸持续侵蚀,等深线不断向岸移动,堤前海床不稳定性逐渐加剧,2015年84.20%的堤前海床处于强或极强不稳定状态。本研究可为新形势下黄河三角洲综合治理提供科学依据。 The seabed erosion in the coastal area of the Yellow River Delta has become more prominent due to the influence of decrease in water and sediment entering into the sea,the high intensity development of coastal zone and the ocean dynamical action in recent years.The seabed erosion process and the stability change in the engineering protection zone of the Yellow River Delta are studied based on the measured topographic and wave data.The seabed erosion in the engineering protection zone is mainly distributed within 10 km near shore.From 2007 to 2015,strong erosion occurred mainly within the area 8 km away from the shore.Compared with that in the period from 2000 to 2007 the erosion amount of the seabed in front of the dike increased,and the seabed was eroded intensively toward the coast.With the extension of accretion at the current estuary sand mouth and the continuous erosion in the shallow area of the Gudong dike,a reverse profile of“deep nearshore and shallow offshore”was gradually formed in the offshore waters of the southern Gudong dike.With the continuous erosion of nearshore in the engineering protection zone,the contour lines shifted continuously toward the coast and the instability of the seabed in front of the dike intensified gradually.In 2015,84.20%of the seabed in front of the dike was in a strong or extremely strong unstable state.This study can provide a scientific basis for the comprehensive management of the Yellow River Delta in the new situation.
作者 凡姚申 陈沈良 窦身堂 于守兵 杜小康 FAN Yao-shen;CHEN Shen-liang;DOU Shen-tang;YU Shou-bing;DU Xiao-kang(Yellow River Institute of Hydraulic Research,YRCC,Zhengzhou 450003,China;Key Laboratory of Yellow River Sediment,Ministry of Water Resource,Zhengzhou 450003,China;State Key Laboratory of Estuarine and Coastal Research,East China Normal University,Shanghai 200241,China)
出处 《海岸工程》 2020年第2期77-85,共9页 Coastal Engineering
基金 国家重点研发计划项目——黄河三角洲海岸演变过程与动力机制(2017YFC0405503) 国家自然科学基金委-山东省人民政府联合资助项目——黄河三角洲地貌演变的动力机制与环境效应(U1706214) 黄河水利科学研究院基本科研业务费专项——水沙补给对刁口河流路海岸侵蚀的缓解作用研究(HKY-JBYW-2020-06)。
关键词 黄河三角洲 工程防护区 海床侵蚀 不稳定性评估 海堤安全 the Yellow River Delta engineering protection zone seabed erosion instability assessment seawall safety
  • 相关文献

参考文献5

二级参考文献55

共引文献134

同被引文献49

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部