摘要
研究分析了龙岩动车运用所总平面布置方案,并结合段址狭小、检查库下方交通涵等制约因素总结设计亮点,归纳了BIM辅助设计、立体作业平台、综合管架集成吊挂系统、库前洗车机等新工艺、新装备的应用,体现了高标准、以人为本的设计理念,确保了动车组快速高效的运用检修,提高了动车组运用效率。
This paper studies and analyzes the general layout plan of Longyan EMU depot. Combined with the constraints of the narrow site and the traffic culvert below the inspection workshop and so on, the design highlights of Longyan EMU depot are summarized. It sums up the application of new technology and new equipment such as BIM assisted-design, stereoscopic work platform, integrated pipe rack integrated hanging system and EMU washing machine befor the inspection workshop. It embodies the high standard and people-oriented design concept,ensuring the rapid and efficient operation and maintenance of EMU and improving the efficiency of EMU.