期刊文献+

基于电力市场现货交易下的黑河流域梯级电站水库优化运行方案研究 被引量:1

Research on Optimal Operation Scheme of Cascade Hydropower Station Reservoir in Heihe Basin Based on Spot Transaction in Power Market
下载PDF
导出
摘要 根据黑河的来水和电力现货实时交易情况,充分利用黑河流域两座大水库龙首二级和宝瓶水电站进行水库的预发、预泄和预蓄,并结合现货交易进行水库水量调节,从而实现黑河流域各级电站经济运行和现货交易的双重丰收。 According to the heihe river water and electricity spot transactions in real time,make full use of the heihe river basin two big dragon secondary reservoir and Aquarius hydropower station reservoir of pretest,beforehand drainage and storage,and combining the spot trading of reservoir regulation,so as to realize the heihe river basin power plant economic operation at all levels and spot trading of double harvest.
作者 汪文波 WANG Wen-bo(Gansu Power Tuo Hexi Hydropower Development Co.,Ltd.,Zhangye 734000,China)
出处 《通信电源技术》 2020年第9期232-234,237,共4页 Telecom Power Technology
关键词 现货交易 梯级电站优化 水量调节 spot transaction cascade power station optimization regulating volume
  • 相关文献

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部