摘要
本文通过对地铁盾构下穿建筑物施工技术的探究,明确地铁盾构下穿施工要求,并结合成都地铁6号线工程实际案例,提出地铁盾构下穿建筑物的掘进施工技术要点。研究表明,在条件适应的情况下,通过优化施工技术可达到理想的施工效果,更好地满足地铁工程施工质量要求。
Through the exploration of the construction technology of subway shield tunneling through buildings,this paper clarifies the construction requirements of metro shield tunneling,and combines with the actual case of Chengdu Metro Line 6,finds out the key points of the construction technology of metro shield tunneling through buildings,and then analyses the construction technology of metro shield tunneling through buildings.The research shows that under the suitable conditions,by optimizing the construction technology,the ideal construction effect can be achieved and the construction quality requirements of metro engineering can be better satisfied.Hope that through the elaboration of this article,it can provide some reference for related fields.
作者
李全保
LI Quanbao(China Railway Eighteenth Bureau Group Fourth Engineering Co.Ltd. Tianjin 300350, China)
出处
《洛阳理工学院学报(自然科学版)》
2020年第2期50-52,59,共4页
Journal of Luoyang Institute of Science and Technology:Natural Science Edition
关键词
地铁
盾构
建筑物
施工技术
subway
shield
building
construction technology