高山滑雪赛道空间塑形关键技术

Key Technology of Space Shaping of Alpine Skiing Tracks
下载PDF
导出
摘要 针对高山滑雪赛道修建中土石方平衡、合理支挡结构选择、符合国际赛事标准形态雪道保证等关键技术问题,通过理论分析和数值模拟等方法,采用调整整体标高和利用开挖土石方填方措施解决了土石方开挖量大难题,针对赛道潜在滑移风险,在D2雪道的填筑过程中现场设置了抗滑桩和抗滑挡墙,保证雪道整体稳定性。 In view of the key technical problems in the construction of alpine skiing tracks,such as earthwork balance,reasonable selection of retaining structure,guarantee of snowway conforming to the international competition standard form,etc.,through theoretical analysis and numerical simulation and other methods,the problem of large excavation volume of earthwork is solved by adjusting the overall elevation and using excavation earthwork filling.In view of the potential slip risk of the tracks,in the filling process of D2 snowway,anti-slide piles and anti-slide retaining walls are set up on site to ensure the overall stability of the snow tracks.
作者 李旭阳 王春平 梁博文 LI Xuyang;WANG Chunping;LIANG Bowen(CCCC Tunnel Engineering Co.,Ltd.,Beijing 100102,China)
出处 《施工技术》 CAS 2020年第10期47-49,共3页 Construction Technology
基金 国家重点研发计划:复杂山地条件下冬奥雪上项目竞赛场馆设计施工关键技术研究(2018YFF0300302)。
关键词 地基 高山滑雪 赛道 塑形 有限元分析 土石填方 foundations alpine skiing tracks shaping finite element analysis earth rock fill
  • 相关文献

参考文献6

二级参考文献48

共引文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部