摘要 两河口水电站石方开挖量大,开挖质量要求高,采用预裂爆破技术来控制开挖质量。通过预裂爆破生产性试验来验证爆破设计参数的合理性,并根据施工现场地质情况适时对爆破参数进行优化、调整,以期取得较好的开挖质量。 Lianghekou Hydropower Station has a large amount of rock excavation and high requirements for excavation quality.Presplitting blasting technology is used to control the excavation quality.Through the productive test of presplitting blasting,the rationality of blasting design parameters is verified,and the blasting parameters are optimized and adjusted according to the geological conditions of the construction site,so as to obtain better excavation quality.
作者 孙道泽 SUN Dao-ze(POWERCHINA SINOHYDRO BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2020年第4期11-13,共3页 Yunnan Water Power
关键词 引发水电系统 两河口 预裂爆破 生产性试验 Lianghekou presplitting blasting productive test results
  • 相关文献

参考文献1

二级参考文献1

  • 1水工建筑物地下开挖工程施工技术规范,DL/T099-1999[s].

共引文献2

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部