新冠疫情事件的工期与费用索赔 被引量:1

Claims for Extension of Time and Costs under the COVID-19 Epidemic
下载PDF
导出
摘要 新冠疫情事件发生后,其对建设工程合同及工程造价的影响成为大家的热议话题。律师界的同仁们大多从适用法律的角度写了很多文章,但针对工期和费用索赔方面的文章较少。作者结合自身在工程造价管理制度建设、标准编制和工程咨询实践方面的知识,就本次新冠疫情事件下工期与费用索赔的主张依据、程序、证据、主要内容与计算方法进行了系统性分析,希望引起大家的重视和深入研究。 Since the outbreak of the COVID-19,its impact on construction contracts and construction costs has become a hot topic.Many articles have been written from legal perspective,but few focus on claims for extension of time and costs.Based on the knowledge of construction cost management system,standard compilation and engineering consultation practice,the authors make a systematic analysis on the basis,procedure,evidence,main contents and calculation methods of claim for extension of time and cost in construction project under the COVID-19 epidemic.The authors hope this article can be of help for further exploration on this topic.
作者 吴佐民 潘敏 Wu Zuomin;Pan Min
出处 《北京仲裁》 2020年第1期1-25,共25页 Beijing Arbitration Quarterly
关键词 新冠 疫情 工期 费用 索赔 不可抗力 COVID-19 epidemic extension of time costs claims force majeure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部