摘要
根据某矿井(含洗煤厂)环评文件和企业提供资料,设计了该项目的竣工环境保护验收调查方案,包括调查的目的、调查原则、调查方法、调查范围和重点、调查因子、验收调查标准及总量要求,以及验收调查设计方案的执行和调整原则,为更好地开展某矿井(含洗煤厂)竣工环境保护验收调查提供前期技术支持。
According to the environmental assessment documents of a mine(including coal washing plant)and the information provided by the enterprise,the completed environmental protection acceptance survey plan for the project was designed,including the purpose of the survey,the principles of the survey,the survey methods,the scope and focus of the survey,the survey factors,and the survey standards and total requirements,as well as the implementation and adjustment principles of acceptance survey design schemes,provide preliminary technical support for better carrying out environmental protection acceptance surveys for the completion of a mine(including coal washing plants).
出处
《山西科技》
2020年第4期71-74,共4页
Shanxi Science and Technology
关键词
环境保护验收调查
方案设计
矿井
洗煤厂
environmental protection acceptance survey
scheme design
mine
coal washing plant