摘要
地形图是每一个工程项目竖向设计最基础的输入资料,但大多数工程项目在前期阶段不一定能提供详细的地形图,特别是在国外或偏远地区的项目.因此,如何深入分析未测量场地地形在项目前期尤为重要.文章借助谷歌地球和Civil 3D软件,生成厂区地形图,探讨未测量场地竖向设计方案,以供参考.
Topographic map is the most basic input data for vertical design of every engineering project,but most engineering projects do not necessarily provide detailed topographic map in the early stage,especially involving foreign or remote areas.Therefore,how to deeply analyze the topography of the unmeasured site is particularly important in the early stage of the project.With the help of Google Earth and civil 3D software,this paper generates the topographic map of the factory and discusses the vertical design scheme of the unmeasured site for reference.
作者
李峰
Li Feng(China Energy Engineering Group Hunan Electric Power Design Institute Co.,Ltd.,Changsha,Hunan 410100)
出处
《工程技术研究》
2020年第11期231-232,共2页
Engineering and Technological Research
关键词
地形图
场地分析
竖向设计
topographic map
site analysis
vertical design