期刊文献+

抽水蓄能电站勘察设计招标最高投标限价编制探讨

Discussion on the Compilation of the Maximum Bid Price in the Investigation and Design Bidding of Pumped Storage Power Station
下载PDF
导出
摘要 随着国家能源结构的不断调整以及新型基础设施建设的不断推进,政策导向促使抽水蓄能电站工程建设蓬勃发展,招标投标行为十分活跃,最高投标限价在抽水蓄能电站项目招投标阶段对于投资管控起着重要作用。通过对抽水蓄能电站最高投标限价编制存在的问题进行阐述和探讨,为编制类似项目提供一定的参考和借鉴。 With the continuous adjustment of the national energy structure and the continuous advancement of new infrastructure construction,policy guidance has promoted the vigorous development of pumped storage power station projects,and the bidding and tendering activities are very active.The maximum bid price plays an important role in investment management during the bidding stage of the pumped storage power station project.Through the elaboration and discussion of the problems existing in the compilation of the maximum bidding price of the pumped storage power station,it will provide a certain reference for the preparation of similar projects.
作者 丁师伟 DING Shi-wei(Shandong Taishan Pumped Storage Power Station Co.,Ltd.,Taian 271000,China)
出处 《价值工程》 2020年第20期47-48,共2页 Value Engineering
关键词 抽水蓄能电站 最高投标限价 编制探讨 pumped storage power station maximum bid price discussion on compilation
  • 相关文献

参考文献4

二级参考文献6

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部