溧阳抽水蓄能电站水泵水轮机结构设计 被引量:2

Structure Desgin for Pump Turbine of Liyang Pump Storage Power Stations
下载PDF
导出
摘要 溧阳水泵水轮机运行水头变幅最大达到1.301,设计难度较大,本文详细介绍了溧阳水泵水轮机主要部件结构设计的兲键点。溧阳水泵水轮机作为国内首个在宽变幅水头下不设置非同步导叶预开启装置的完全国产化水泵水轮机,同时也是国内首个在设计阶段彻底取消消水环排水系统的国产化机组,具有广泛的应用推广价值。 The maximum variation of the operating head of Liyang pump turbine is 1.301, which is difficult to design. This paper introduces the key points of the structural design of the main components of Liyang pump turbine in detail. Liyang water pump turbine is the first fully domestic pump turbine without none-synchronous guide vane preopening device under wide variation water head in China. It is also the first domestic pump turbine that completely cancels the water dissipation ring drainage system in the design stage, which has a wide application in the future.
作者 宫让勤 于鹏飞 高欣 GONG Rangqin;YU Pengfei;GAO Xin(State Key Laboratory of Hydro-power Equipment(Harbin Institute of Large Electrical Machinery),Harbin 150040,China;Harbin Electric Machinery Company Limited,Harbin 150040,China)
出处 《大电机技术》 2020年第4期64-69,82,共7页 Large Electric Machine and Hydraulic Turbine
关键词 水泵水轮机 结构设计 同步导叶启动 消水环排水 pump turbine structure design synchronous guide vanes start water dissipation ring
  • 相关文献

参考文献10

二级参考文献13

共引文献38

同被引文献18

引证文献2

二级引证文献2

  • 1陈志明,靳发业,林恺,毕慧丽,王焕茂,罗永要.抽水蓄能机组水轮机工况启动过程转轮动应力特性[J].大电机技术,2024(1):8-14.
  • 2陈海生,李泓,徐玉杰,徐德厚,王亮,周学志,陈满,胡东旭,阎景旺,李先锋,胡勇胜,安仲勋,刘语,肖立业,蒋凯,钟国彬,王青松,李臻,戴兴建,张宇鑫,俞振华,宋振,彭煜民,马一鸣,郭欢,王星,周鑫,胡傲伟,张弛,相佳媛,张浩,刘为,岳芬,张长昆,谢飞,夏恒恒,杨重阳,邱清泉,艾巍,李浩秒,刘轩,梅文昕,李煌.2023年中国储能技术研究进展[J].储能科学与技术,2024,13(5):1359-1397.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部