摘要
首先设计了全生命周期模型,其次设计了全生命周期工程投资项目管控流程,最后应用了全生命周期模型,旨在为基于全生命周期的工程投资项目管控工作的进行提供参考,以提高加油气站建设工程投资项目管控质量和效率,在确保建设工程施工质量和效率的同时,提高投资企业的资金应用率。
This article first designed a full life cycle model,followed by a full life cycle engineering investment project management and control process,and finally applied a full life cycle model,designed to provide reference opinions for the management and control of engineering investment projects based on full life cycle In order to improve the quality and efficiency of the management of investment projects of gas station construction projects,while ensuring the quality and efficiency of construction projects,the investment rate of investment enterprises is increased.
出处
《化工设计通讯》
CAS
2020年第7期25-26,共2页
Chemical Engineering Design Communications
关键词
全生命周期
工程投资
加油气站
成品油销售
full life cycle
engineering investment
gas station
product oil sales