期刊文献+

矩形顶管上穿地铁隧道施工对地表变形影响研究 被引量:3

Study on the influence of construction of rectangular box jacking through metro tunnel on ground deformation
下载PDF
导出
摘要 依托国内外研究现状,对矩形顶管施工引起地面变形原因进行了分析,提出地层损失是造成地面变形的主要原因。依托苏州人民路矩形顶管工程,将顶管机进入不同区域对轨道交通2号线的影响划分为5个重要阶段,以垂直顶管隧道轴线及垂直地铁隧道轴线方向为监测断面,分析现场实测数据发现关于顶管轴线处沉降规律、垂直顶管轴线监测沉降规律及地铁隧道上、下行线轴线处沉降规律,并提出在隧道上方地面堆加荷载、矩形顶管管节内部施加荷载及注入触变泥浆等控制地表变形的措施。 Relying on the current research situation at home and abroad,the causes of ground deformation caused by the construction of rectangular box jacking are analyzed,and the formation loss is the main cause of ground deformation.Relying on the rectangular box jacking project of Renmin Road in Suzhou,the impact of the box jacking machine entering different areas on the rail transit line 2 is divided into five important stages.The vertical box jacking tunnel axis and the vertical subway tunnel axis are taken as monitoring sections to analyze the actual measurement.The data found that about the settlement law at the box jacking axis,the monitoring settlement law at the vertical jacking box axis,and the settlement law at the uplink and downlink axis of the subway tunnel,measures to control surface deformation are propose,it was proposed to add loads on the ground above the tunnel,to apply loads inside the rectangular box jacking section and injecting thixotropic mud.
作者 薛青松 Xue Qingsong(No.1 Engineering Corporation Limited of China Railway 20 Bureau Group,Suzhou 215151,China)
出处 《山西建筑》 2020年第15期9-11,共3页 Shanxi Architecture
关键词 矩形顶管 现场监测 沉降规律 控制措施 rectangular box jacking on-site monitoring sedimentation law control measures
  • 相关文献

参考文献6

二级参考文献45

  • 1邵理中,沈水龙.控制地面沉降的钢筋混凝土企口管顶管施工技术[J].建筑施工,1993,15(3):34-38. 被引量:4
  • 2魏纲,黄志义,徐日庆,章瑞文.顶管施工引起地面变形的计算方法研究[J].岩石力学与工程学报,2005,24(A02):5808-5815. 被引量:33
  • 3魏纲,魏新江,徐日庆.顶管施工引起的挤土效应研究[J].岩土力学,2006,27(5):717-722. 被引量:19
  • 4由广明,朱合华,刘学增,葛金科.曲线顶管施工环境影响的三维有限元分析[J].地下空间与工程学报,2007,3(2):218-223. 被引量:23
  • 5房营光 莫海鸿 唐杰康 等.顶管施工引起的土体扰动区的实测理论与分析[J].广州建筑,2001,:14-19.
  • 6Jancsecz S, Steiner W. Face support for a large mix-shield in heterogeneous ground conditions[A]. Tunnelling 94, conference proeedings, Institution of Mining and Metallurgy and British Tunnelling Society[C]. London: Chapman and Hall, 1994. 531 -549.
  • 7Jefferis S A. Slurrids, Grouts. Chapter 48 of Construction Materials Reference Book[M]. Doran D K. Oxford:Butterworth- Heinemann, 1992.
  • 8Anagnostou, G. and Kovari, K. Face stability in slurry and EPB shield tunneling[J]. Tunnels and Tunnelling, 1996, 28(12): 27-29.
  • 9Milligan G W E, Norris P. Pipe-soil interaction during pipe jacking. Proceedings of the Institution of Civil Engineers[J]. Geotechnicai Engineering, 1999, 137(1): 27-44.
  • 10余彬泉 陈传灿.项管施工技术(第一版)[M].北京:人民交通出版社,1998..

共引文献304

同被引文献11

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部