轨道工程盾构施工遇桩基础进行托换设计分析

Design and analysis of underpinning of pile foundation in shield construction of track engineering
下载PDF
导出
摘要 轨道盾构施工经常遇到沿线原有桩基础侵入隧道而需对其进行托换,介绍了通过优化原桩基托换方案,结合可行的计算分析方法,使得工程风险变小,施工更为便捷,为解决轨道施工中常遇到的类似问题提供了很好的借鉴,具有很好的推广应用价值。 The existing pile foundation along the line often intrudes into the tunnel and needs to be underpinned in the construction of the track shield,introduces the optimization of the original pile foundation underpinning scheme,combined with the feasible calculation and analysis method,which makes the project risk smaller and the construction more convenient.It provides a good reference for solving the similar problems often encountered in the track construction and has a good promotion and application value.
作者 郑大叶 Zheng Daye(Dongguan Institute of Building Research,Dongguan 523000,China)
出处 《山西建筑》 2020年第15期57-58,共2页 Shanxi Architecture
关键词 桩基托换 盾构施工 天然地基 pile underpinning shield construction natural foundation
  • 相关文献

参考文献2

二级参考文献10

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部