摘要
通过对项目的勘察报告、桩基施工过程等进行分析,弄清该项目静压PHC管桩承载力不足产生的原因,并提出对所有桩基进行复压等措施,解决桩基承载力不足的问题,取得了较好的经济效益和社会效益。
Through the analysis of the investigation report and pile foundation construction process of the project,the causes of the insufficient bearing capacity of the static pressure PHC pipe pile of the project are clarified,and the measures such as recompression of all pile foundations are put forward to solve the problem of insufficient bearing capacity of pile foundations,and good economic and social benefits are achieved.
出处
《福建建设科技》
2020年第4期43-46,共4页
Fujian Construction Science & Technology
关键词
PHC管桩
静压桩
承载力不足
处理措施
PHC pipe pile
static pressure pile
Insufficient bearing capacity
treatment measures