摘要 以道庆洲大桥S16#墩为背景,该墩位于先前航道处,地质为中砂且水深水流急冲刷强度大,中砂抗冲刷能力弱,冲刷深度大,通过采用高低双层钢板桩施工,能够成功地解决单层钢板桩抗冲刷、节约成本及施工安全问题,工程实践证明此方案可行,能够节约工期、成本、保证安全质量,为后续桥梁在水深水流急冲刷强度大环境下施工提供了实战经验。 Taking the S16#pier of Daoqingzhou Bridge as the background,which is located in the previous passage,with geological condition of medium sand and the depth of water erosion intensity big,medium sand scour resistance weak,scour depth big.By means of double steel sheet pile construction,it is able to successfully solve the anti-scouring,cost and safety problems of mono-layer steel sheet pile.Engineering practices prove that this scheme is feasible,and can save time,cost,ensure the quality,and provide practical experience for subsequent bridges construction under deep and high erosion intensity water environment.
作者 班航 高璞 刘晓敏 石怡安 BAN Hang
出处 《福建建设科技》 2020年第4期82-84,共3页 Fujian Construction Science & Technology
关键词 道庆洲大桥 水深 水急 冲刷强度大 Daoqingzhou Bridge water depth water emergency large flushing intensity
  • 相关文献

参考文献4

二级参考文献11

  • 1李万华,姜波.深水基坑单壁钢板桩围堰设计与施工[J].现代交通技术,2004,1(1):51-55. 被引量:4
  • 2H N C Breusers, G NicoUet, H W Shen. Local Scour Around Cylindrical Piers [ J ]. Journal of Hydraulic Research,1977, 15 (3): 219-220.
  • 3TB10017-99.铁道部第三勘测设计院主编.铁路工程水文勘测设计规范[S].[S].中华人民共和国铁道部,..
  • 4铁道科学研究院铁道建筑研究所.桥墩局部冲刷墩形系数[R].北京:铁道科学研究院,1978..
  • 5铁道科学研究院铁道建筑研究所.桥墩局部冲刷计算[R].北京:铁道科学研究院,1984..
  • 6铁道科学研究院铁道建筑研究所.桥墩局部冲刷模型试验资料[R].北京:铁道科学研究院,1963..
  • 7TB10017-99.铁路工程水文勘测设计规范[S].[S].,..
  • 8H N C Breusers, G Nicollet, H W Shen.Local Scour Around Cylindrical Piers [J].Journal of Hydraulic Research,1977, 15 (3): 219-220.
  • 9陈仲颐 叶书麟.基础工程学[M].北京:中国建筑工业出版社,1993..
  • 10余志成 施文华.深基坑支护设计与施工[M].北京:中国建筑工业出版社,1999..

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部