期刊文献+

电力调度录音系统与SCADA系统时间同步的实现

Realization of Time Synchronization between Power Dispatching Recording System and SCADA System
下载PDF
导出
摘要 电力行业调度录音系统“孤岛”运行,其系统时间无法与站内SCADA系统时间精确同步,导致调度录音无法准确还原厂站运行过程,无法以准确的时间来分析事故事件发生的原因及过程。对此,提出将调度录音系统接入站内GPS时间同步设备中,实现调度录音系统时间与SCADA系统时间精确同步。 Power dispatching recording system runs stand-alone in the electric-power industry at present.Its system time cannot achieve accurate synchronization with SCADA system in the substation,resulting in the failure to restore the operation process and to analyze the cause and process of the accident with accurate time.For the above disadvantages,it was proposed to connect dispatching recording system to GPS time synchronization equipment in substation to realize the precise synchronization of the two systems.
作者 王佳明 WANG Jiaming(Guangzhou Bureau of EHV Transmission Company,Guangzhou 510700,China)
出处 《电工技术》 2020年第11期66-67,76,共3页 Electric Engineering
关键词 录音系统 SCADA系统 时间同步 recording system SCADA system time synchronization
  • 相关文献

参考文献3

二级参考文献8

  • 1马晓晨.电力调度多路实时电话录音管理系统的开发与应用[J].信息技术,2004,28(11):59-61. 被引量:3
  • 2KOCHETKOV AI. Monitoring and recording of electric power via electric power supply networks[J]. Measurement Techniques, 2004, 47(7): 678-681.
  • 3NGUYEN T H, SADIKU M N O. Next generation networks[J]. IEEE Potentials, 2002, 21 (2): 6-8.
  • 4GOEL R, MEHTA A, SETH D. Next generation networks; regulation and interconnection in modern communications era[C]// Telecommunications Network Strategy and Planning Symposium(NETWORKS 2006), 2006.
  • 5WILLIAMS. The softswitch advantage[J]. IEEE Review, 2002, 48(4): 25-29.
  • 6RUSSINOVICH M. Inside I/O completion ports[EB/OL]. http://technet.microsoft.com, 2012-12-21.
  • 7余鹏ls,李海燕.多通道电话录阿系统的设计与实现[J].计算机工程与没汁,2007,28(3):735-736.
  • 8张朝霞,金李莎.从电力专用通信网与公用通信网的区别看电力调度交换机的特殊性[J].电网技术,2000,24(3):62-65. 被引量:8

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部