铁路专用线项目建设期全过程造价控制分析

Analysis of Cost Control in the Whole Process of Construction Period of Railway Special Line Project
下载PDF
导出
摘要 介绍企业投资铁路专用线项目全过程造价控制准备,从工作准备,项目初设审核立项、招标、合同签订、变更管理、预结算、竣工决算、审计及竣工验收等各个阶段探讨铁路专用线项目建设期全过程造价控制措施,为建设项目投资控制、建设期与运营期成本平衡、以及类似项目的实施提供参考。 This paper introduces the whole process cost control of the industrial railway project,from the work preparation,the examination and approval at initial stages of project,seek procurement tenders,contract signing,engineering change,budget and settlement,final accounts of completion,audit and acceptance of completion,etc,discusses the whole process cost control measures of industrial railway project,which provides reference for the investment control of construction project,the cost balance between construction period and operation period,and the implementation of similar projects in the future.
作者 曹晓辉 CAO Xiaohui(Engineering Management Department,China Coal Northwest Energy Co.,Ltd,Erdos 017200,China)
出处 《工程经济》 2020年第5期42-45,共4页 ENGINEERING ECONOMY
关键词 铁路专用线 造价控制 全过程 项目投资 industrial railway cost control whole process project investment

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部