综采工作面机电设备安装工艺研究 被引量:2

Research on Mechanical and Electrical Equipment Installation Technology in Fully Mechanized Mining Face
下载PDF
导出
摘要 针对目前煤矿综合机械化采煤生产过程中,机电设备安装用时较长、安装水平参差不齐的现状,对工作面机电设备安装工艺进行研究。对采煤机电设备移动、安装、调试过程中的操作前准备、操作流程、注意事项进行了研究与总结,并对综采工作面机电设备的安装工艺流程进行程序优化。该安装工艺可以节省安装与调试时间、提高安装效率与安装质量,预计应用可以大大提高煤矿经济效益、减少工人工作量,切实保障煤矿的生产安全。 In view of the current situation that the installation time of electromechanical equipment is long and the installation level is uneven in the current mechanized coal mining production process of coal mines,the installation technology of electromechanical equipment in working face was studied.The operation preparation,operation flow,and precautions during the movement,installation,and commissioning of coal mining mechanical and electrical equipment were studied and summarized,and the installation process of mechanical and electrical equipment in the fully mechanized mining face was optimized.The installation process can save installation and commissioning time,improve installation efficiency and installation quality,and it is expected that the application can greatly improve the economic efficiency of the coal mine,reduce the workload of workers,and effectively guarantee the production safety of the coal mine.
作者 郭波 GUO Bo(Yanzishan Mine,Tongmei Group,Datong,Shanxi 037003,China)
出处 《机电工程技术》 2020年第6期40-41,共2页 Mechanical & Electrical Engineering Technology
关键词 煤矿 综合机械化 机电设备 安装工艺 coal mine comprehensive mechanization electromechanical equipment installation process
  • 相关文献

参考文献8

二级参考文献27

共引文献34

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部