关于风电项目分阶段建设移交运行管理工作的探讨 被引量:2

Phased Construction,Handover and Operation of Wind Power Projects
下载PDF
导出
摘要 由于多数风电场建设和生产运行维护工作分属两个不同专业团队或公司,再加上风电项目建设存在分批次投运及专项验收过程较长等问题,按常规项目竣工验收后再进行整体移交,势必会引起双方工作界面不清晰,责任不明确或影响投产时间等问题。总结归纳以往的经验,提出了分阶段分批次移交的方式,在具备条件的情况下尽量做到零缺陷移交投运的目标。 In many wind power projects,the construction and the production,operation and maintenance are carried out by different professional teams or companies.Also,wind power projects are usually put into operation in phases and the acceptance process is of a long time.If the traditional mode of overall handover after construction completion is adopted,certain problems will arise such as unclear boundaries and responsibilities of each parties,and the delay of the production time.Therefore,a phased construction,handover and operation mode is proposed.When certain conditions are satisfied,a defect-free handover should be realized as far as possible.
作者 刘超 刘帅 LIU Chao;LIU Shuai(Powerchina Zhongnan Engineering Co., Ltd., Changsha 410014, China;Sanya Guangxing Industrial Development Co., Ltd., Sanya 572000, China)
出处 《水电与新能源》 2020年第7期21-22,27,共3页 Hydropower and New Energy
关键词 风电项目 分阶段 建设 移交 生产运营 wind power project phased construction handover production operation
  • 相关文献

参考文献6

二级参考文献11

共引文献20

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部