期刊文献+

带时间窗的装备维修器材生产路径建模与优化

Modeling and Optimization of Production Routing Problem with Time Windows for Equipment Maintenance Material
下载PDF
导出
摘要 对在时间窗约束下优化与决策合适的生产、库存和配送计划进行了研究,建立了以最小化总成本为目标的混合整数线性规划模型,并加入不等式改进该模型。为检验模型和不等式的有效性,通过随机生成的算例,在CPLEX平台上进行算法数值试验,结果表明该模型是可行的,针对在有限计算时间内未求得最优解的算例,提出的有效不等式有助于CPLEX生成更好的下界。 Integrated optimization of production,inventory,distribution and routing problems in supply support of the equipment maintenance material is a classical production routing problem.In order to conform to the actual situation,this paper investigated how to effectively optimize and decide a proper production,inventory,distribution plan.A mixed integer linear programming model aiming at minimizing total cost was formulated.To strengthen the formulation,some valid inequalities were introduced.Randomly generated instances were used to verify the effectiveness of the proposed model and inequalities,which was solved by the CPLEX solver.Experimental results demonstrate that the proposed model is feasible and the introduced valid inequalities are useful in helping CPLEX generate better lower bound for instances that are not optimally solved within the time limit.The results can provide an integrated equipment maintenance material supply plan for a decision maker.
作者 滕尚儒 何成铭 丛彬 TENG Shangru;HE Chengming;CONG Bin(Equipment Support and Remanufacturing Department, Army Academy of Armored Forces, Beijing 100072, China;Information Security Room of the Armament Department of PLA Army, Beijing 100072, China)
出处 《兵器装备工程学报》 CAS 北大核心 2020年第7期81-85,89,共6页 Journal of Ordnance Equipment Engineering
基金 装备预研领域基金项目(61400010301)。
关键词 装备保障 生产路径 时间窗 优化模型 有效不等式 equipment support production routing time windows optimization model valid inequalities
  • 相关文献

参考文献2

二级参考文献18

  • 1赵达,李军,马丹祥.求解随机需求库存-路径问题的一种算法[J].系统工程,2006,24(5):23-28. 被引量:18
  • 2赵达,李军,李妍峰,孙斌锋.随机需求库存-路径问题:研究现状及展望[J].系统工程,2007,25(8):38-44. 被引量:16
  • 3Federgruen A, Zipkin P. A combined vehicle routing and inventory allocation problem[ J]. Operations Research, 1984, 32 (5) : 1019-1036.
  • 4Qu w, James H B, Iyogun P. An integrated inventory-transportation system with modified periodic policy for multiple products [ J ]. European Journal of Operational Research, 1999, 115 (2) : 254-269.
  • 5Adelman D. A price-directed approach to stochastic inventory/routing[ J]. Operations Research, 2004, 52 (4) : 499-514.
  • 6Viseanatham S. Integrating routing and inventory decision in one-warehouse muhiretailer muhiproduct distribution systems[J]. Management Science, 1997, 3 : 294-312.
  • 7Campbell A, Clarke L, Kleywegt A. The inventory routing problem[J]. Atlanta, GA 30332-0205, 1997.
  • 8Minkoff A S. A Markov decision model and decomposition heuristic for dynamic vehicle dispatching[ J], Operation Research, 1993, 41 : 77-90.
  • 9Kleywegt A J, Nori V S, Savelsbergh M W P. The stochastic inventory routing problem with direct deliveries[ J. Transporta- tion Science, 2002, 36(1): 94-1i8.
  • 10Liu S C, Lee W. T. A heuristic method for inventory routing problem with time windows[ J. Expert Systems with Applica- tions, 2011, 38: 13223-13231.

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部