注浆加固技术在断层构造区巷道加固的应用 被引量:5

Application of Grouting Reinforcement Technology in Roadway Reinforcement in Fault Structural Area
下载PDF
导出
摘要 为了避免干河煤矿2-126工作面一绕巷F~#点前22m处受断层影响,约12m范围内围岩变形得到有效控制,通过理论计算并结合现场实际情况,确定了4MPa注浆压力、4.8m注浆深度及800mm注浆钻孔排距的注浆参数,共布置15排60个注浆孔分循环进行该段巷道的注浆加固作业。围岩变形量监测发现,围岩变形控制在允许范围内,取得了较好的加固效果。 In order to avoid the influence of faults at 22m in front of F~#point of No.2-126 working face of Ganhe Coal Mine,the surrounding rock deformation within 12m range can be effectively controlled.Through theoretical calculation and combining with the actual situation of the site,the grouting parameters of 4MPa grouting pressure,4.8m grouting depth and 800mm grouting hole row spacing are determined.A total of 15 rows of 60 grouting holes are arranged to carry out grouting reinforcement of this section of roadway by cycle.It is found that the deformation of surrounding rock is controlled within the allowable range and good reinforcement effect is achieved.
作者 弓伟 Gong Wei(Shanxi Huobao Ganhe Coal Mine Co.,Ltd.,Shanxi Linfen 041602)
出处 《山东煤炭科技》 2020年第7期60-62,共3页 Shandong Coal Science and Technology
关键词 巷道 断层 注浆 加固 roadway fault grouting reinforcement
  • 相关文献

参考文献3

二级参考文献24

  • 1赵忠敏,董方庭.大断面硐室锚喷支护试验研究[J].煤炭科学技术,1989,17(4):14-16. 被引量:1
  • 2董方庭,建井技术,1991年,2/3期,40页
  • 3董方庭,1988年
  • 4鹿守敏,中国矿业学院学报,1987年,3期,23页
  • 5楚泽涵,声波测井原理,1987年
  • 6董方庭,建井技术,1985年,3期,34页
  • 7董方庭,中国矿业学院学报,1985年,2期,49页
  • 8李世平,中国矿业学院学报,1981年,3期,73页
  • 9Brantberger M, Stille H, Eriksson M. Controlling grout spreading in tun nel grouting-analyses and developments of the GIN-method[ J]. Tunneling and Undergoround Space Technology, 2000,15(4) :343 - 352.
  • 10郑长成.裂隙岩体灌浆的模拟研究[M].长沙:中南工业大学,1999..

共引文献760

同被引文献14

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部