期刊文献+

综放工作面回撤方案优选实践探析 被引量:5

Practice on Withdrawal Plan Optimization for Fully-mechanized Caving Face
下载PDF
导出
摘要 为实现综放工作面的快速回撤,以山煤长春兴煤业101首采工作面为研究背景,对比分析了无预掘回撤通道、预掘单一回撤通道以及预掘双回撤通道三种传统回撤技术的优缺点,确定采用单一回撤通道作为本矿井综放工作面的回撤工艺。针对矿井开采实际条件,提出对回撤通道的支护工艺以及回撤通道与工作面贯通时相关的安全技术措施,工作面设备回撤过程中,未出现支架压死、顶板大面积冒落和煤壁严重片帮的现象,有效地缩短了综放工作面搬家回撤时间,实现了工作面的安全、快速回撤。 By comparative analysis of three traditional withdrawal technology---non-preexcavating,preexcavating single and double withdrawal passage at 101 first mining face in Changchunxing Coal Industry Co.,Ltd.,the paper proposes the single withdrawal passage for the fully-mechanized caving face,including the supporting techniques and the related safety technical measures in linking up the withdrawal passage with working face,which can effectively shorten the withdrawal time and realize the safe and fast withdrawal with no support crushing,no large-scale roof fall and no serious coal wall rib spalling.
作者 范冬阁 Fan Dongge(Changchunxing Coal Industry Co.,Ltd.,Shanxi Coal Imp.&Exp.Group Co.,Ltd.,Zuoyun,Shanxi 037100)
出处 《江西煤炭科技》 2020年第3期110-113,共4页 Jiangxi Coal Science & Technology
关键词 综放工作面 快速回撤 回撤通道 支护工艺 安全措施 fully-mechanized caving face rapid withdrawal withdrawal passage support technology safety measures
  • 相关文献

参考文献5

二级参考文献26

共引文献478

同被引文献26

引证文献5

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部