海上导管架沉桩施工送桩器能量消散分析 被引量:4

Energy Dissipation Analysis of Pile Extension in Piling of Offshore Wind Turbine Jacket Foundation
下载PDF
导出
摘要 由于部分液压冲击锤不具备水下沉桩能力,海上风电先桩法导管架沉桩施工需要借助送桩器进行送桩。在工程桩桩顶插接送桩器,打桩锤通过锤击送桩器,将能量传递至工程桩,从而将桩打入。通过高应变动力检测手段检测锤击时送桩器及工程桩能量和应力,可以测算送桩器能量消散比例,为海上风电行业沉桩施工及打入性分析提供参考。 Because of some hydraulic impact hammers that do not have the ability to pile underwater,offshore wind power pre-piled jacket often cannot directly drive the pile with a pile hammer,and a pile extension must be used.The piling hammer transmits the energy to the pile by hammering the pile extension,thereby driving the pile to a predetermined depth.The energy dissipation ratio can be measured,by the high-strain dynamic testing during hammering the pile extension,this provideS a reference for the piling analysis in offshore wind power industry.
作者 刘捷 龙正如 苏长南 LIU Jie;LONG Zhengru;SU Changnan(Guangdong YudeanYangjiang Offshore Wind Power Co.,Ltd, Yangjiang 529500, China)
出处 《广东水利水电》 2020年第7期83-86,共4页 Guangdong Water Resources and Hydropower
关键词 沉桩 送桩器 高应变动力检测 piling pile extension high-strain dynamic testing
  • 相关文献

参考文献1

二级参考文献1

  • 1韩晓林等编著,汪凤泉.基础结构动态诊断[M]江苏科学技术出版社,1992.

共引文献1

同被引文献33

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部