摘要
真空制盐项目仪表自动化程度高,仪表控制点多,技术含量高,通过在真空制盐项目仪表施工过程中所遇到的问题,探讨仪表专业在真空制盐项目施工过程中的关键点,以及制盐项目仪表准备阶段、安装阶段和调试阶段的仪表工程管理的问题。
In the vacuum salt project,the instrument has high degree of automation,many instrument control points and high technical content.Through the problems encountered in the instrument construction process of the vacuum salt project.This article discussed the key points of the instrument specialty in the construction process of the vacuum salt project,as well as the management of the instrument engineering in the preparation stage,installation stage and commissioning stage of the instrument in the salt making project.
作者
黄光明
李琪琪
钟志辉
罗磊
邓醉杰
HUANG Guang-ming;LI Qi-qi;ZHONG Zhi-hui;LUO Lei;DENG Zui-jie(China CEC Engineering Corporation,Changsha 410004,China)
出处
《盐科学与化工》
CAS
2020年第6期34-37,共4页
Journal of Salt Science and Chemical Industry
关键词
真空制盐
EPC
仪表
安装阶段
调试阶段
施工管理
Vacuum salt
EPC
instrument
Installation stage
Commissioning phase
Construction management