发电厂继电保护改造拆接线工作控制措施 被引量:1

Control Measures for Dismantling and Wiring Work of Relay Protection Upgrading in Power Plant
下载PDF
导出
摘要 继电保护改造工程如果没有正规的技术措施保障,会造成拆线工作中出现漏拆、错拆的情况,接线工作出现错误,会危及机组的安全稳定运行,甚至造成设备损坏。结合某发电厂的实际事故,分析机组非停和主变损坏的原因,并针对其中的不足提出有效的改进和控制措施。 If there is no specified technical guarantee measures for the relay protection renovation project, there will cause missed and wrong dismantling in wire dismantling work, and errors in wiring work, which may endanger the safe and stable operation of the power unit, and even cause equipment damage. Based on the actual accident case in a power plant, this paper analyzes the causes of unplanned shutdown of unit and transformer damage, and puts forward effective improvement and control measures towards those defects.
作者 张传贵 ZHANG Chuangui(Anhui Huainan Pingwei Power Generation Co.,Ltd.,Huainan 232089)
出处 《电力安全技术》 2020年第6期58-61,共4页 Electric Safety Technology
关键词 继电保护 改造 拆接线 现场实践 relay protection renovation dismantling and wiring work field practice
  • 相关文献

参考文献5

二级参考文献11

共引文献14

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部