摘要
济南泉域地区水资源丰富、水压大、地层复杂且渗透系统大,常规的端头加固方法难以取得理想的止水效果。某地铁车站施工中对高压旋喷加固法,水平冷冻法和钢套筒法进行对比,首次在泉域地层采用钢套筒+辅助减压井的盾构机接收方法,并取得成功。
Ji’nan spring area has rich water resource,high hydraulic pressure,complex stratum and large water seepage,so ordinary end strengthening method could not realize ideal water-stop effect.High-pressure rotary spraying method,horizontal freezing method and steel sleeve method were compared with each other in a subway station construction.It was the first time to use the shield machine receiving method of steel sleeve plus auxiliary pressure relieving well.It is successful application.
作者
李生光
李森
赵洪岩
LI Sheng-guang;LI Sen;ZHAO Hong-yan(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处
《建筑技术》
2020年第7期839-842,共4页
Architecture Technology
关键词
泉域地区
盾构机接收
钢套筒
spring area
shield machine receiving
steel sleeve