摘要 15113综采工作面初采期间,由于老顶未垮落,造成工作面上隅角瓦斯偏高。通过采取调整15113高抽巷流量、上隅角埋设花管抽采瓦斯、上下端头及时退锚、上下隅角打设挡墙等措施,顺利治理了15113工作面上隅角的瓦斯。 During the initial mining of 15113 fully mechanized coal face,the gas in the upper corner of the face is on the high side because the old roof is not collapsed.The gas in the upper corner of 15113 working face was successfully controlled by adjusting the flow of 15113 high drainage roadway,burying flower tubes at the upper corner to extract gas,retreating the anchor at the upper and lower ends in time,and setting up retaining walls at the upper and lower corners.
作者 李红岩 Li Hongyan(Huangyanhui Coal Mine of China Coal Xiyang Energy Co.,Ltd.,Xiyang Shanxi 045300)
出处 《现代工业经济和信息化》 2020年第6期145-146,154,共3页 Modern Industrial Economy and Informationization
关键词 综采工作面 初采 瓦斯治理 comprehensive mining face primary mining gas control
  • 相关文献

二级参考文献5

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部