摘要
随着长江上游梯级水库的建设运行,新水沙条件下荆江在较长一段时期内持续冲刷。采用水沙数学模型预测荆江冲淤演变,结果表明其沿程冲淤变化波动明显。基于启发式分割算法(BG算法),对荆江的冲淤预测结果进行非平稳冲淤序列分割分析,确定了荆江冲刷程度相对严重的8个关键河段和13个冲刷突增的关键节点,与实测水面比降分析结果类比,其中7个关键河段以及8处关键节点得以相互映证。研究成果显示,基于BG算法检测河道冲刷关键节点是一种可行方法。
With the cascade reservoirs in the upper reach of the Yangtze River have been implemented,Jiangjiang Reach which under a different inflow sediment condition has been continually scoured during a long period.Aone-dimensional flow-sediment model was employed to simulate the scour and deposition of the Jingjiang River in the next two decades,which indicated obviously that the scour and depositionwere not stable along the river.The Bernaola-Galvan method was used to segment the nonlinear scour and deposition series into several subsets with different scales.Eight key segments and thirteen key sections of Jiangjiang River were obtained finally.Compared with the research which gave the key segments and sections of Jingjiang river by analysis of the water surface slop of observation data,there were 7 key segments and 8 key reaches can match with each other.Results indicated that the Bernaola-Galvan method was reliable to obtain the key segments and the key sections of scouring river.
作者
关见朝
宋平
王大宇
万金红
GUAN Jian-zhao;SONG Ping;WANG Da-yu;WAN Jin-hong(Department of Sediment Research,China Institute of Water Resources and Hydropou er Research,Beijing 100048,China;Hunan Water Conservancy and Hydropower Research Institute,Changsha 410001,China;Research Center on Flood and Drought Disaster Reduction,China Institute of Water Resources and Hydropouer Research,Beijing 100038,China)
出处
《泥沙研究》
CSCD
北大核心
2020年第3期22-29,52,共9页
Journal of Sediment Research
基金
国家重点研发计划项目(2017YFC0405305)
湘水科技[2015]245-03
国家重大水利工程建设基金项目(12610100000018J129-05)
中国水利水电科学研究院基本科研业务费重点专项(SE0145B792017)。
关键词
荆江
冲刷
关键节点
BG算法
Jingjiang River
scour
key sections
BG algorithm