5SIDHU T S,YIN Yujie.Modeling and simulation for performance evaluation of IEC61850-based substation communication systems[J].IEEE Transactions on Power Delivery,2007,22 (3):1482-1489.
6CIGRE W G. 36. 04 Guide on EMC in power plants and substa- tions[S], 1997.
7He J L, Gong X H. Discussion on electromagnetic compatibility index for secondary system of substation[C]//International Symposium on Electromagnetic Compatibility, 2007(EMC 2007). [S.l.]: IEEE, 2007: 202-205.
8Bajramovic Z, Turkovic I, Mujezinovic A, et al. Overvoltages in secondary circuits of air-insulated substation due to disconnector switching[C]//2012 IEEE International Conference on Power System Technology. Auckland, New Zealand: IEEE, 2012: 1-4.
9Wiggins C M, Thomas D E, Nickel F S, et al. Transient electromag- netic interference in substations[J]. IEEE Transactions on Power Delivery, 1994, 9(4): 1869-1884.
10Russell B D, Harvey S M, Nisssol S L. Substation electromagnetic interference: part 2 susceptibility testing and EMI simulation in high voltage laboratories[J]. IEEE Transactions on Power Apparatus and Systems, 1984, 103(7): 1871-1879.