摘要
静兴高速公路静乐枢纽作为典型的高接高的T型枢纽互通,在方案设计时受到了诸多控制性因素的制约,同时互通方案对汾河大桥规模也产生直接影响,结合项目功能、特点、控制性因素及工程造价等对互通各方案进行比选研究,择优选择。
As a typical high-to-high T-type hub interchange,the Jingle hub of Jingxing Highway is restricted by various controlling factors in the schematic design,and the interchange plan also has a direct impact on the scale of Fenhe Bridge.In this paper,the function,characteristics,controlling factors and construction costs of the project were considered to compare and select the best of each interchange scheme.
作者
王伟
WANG Wei(Shanxi Transportation Survey&Design Institute Co.,Ltd.,Taiyuan,Shanxi 030032,China)
出处
《山西交通科技》
2020年第2期14-16,31,共4页
Shanxi Science & Technology of Transportation