综采设备快速搬迁工艺的应用研究

Application of Rapid Relocation Process for Fully Mechanized Mining Equipment
下载PDF
导出
摘要 为了减少工作面搬迁时间,提高搬迁效率并保证安全,以1306工作面搬迁为背景,在对工作面过断层地质条件进行分析的基础上,设计整套搬迁方案,通过合理选择搬迁路径、优化末采工艺、加强临时支护和其他相应措施,大大缩短了搬迁时间。结果表明:采用快速搬迁工艺之后,1306工作面全部综采设备搬迁时间缩短了近20天,减少了对工作面回采的影响,同时确保了回撤、运输和安装过程中的安全。 In order to reduce the working face relocation time,improve the relocation efficiency and ensure safety,based on the 1306 working face relocation as the background,based on the analysis of the geological conditions of the working face over the fault,the whole set of relocation plan is designed,and the relocation time is greatly shortened by reasonably selecting the relocation path,optimizing the final mining process,strengthening the temporary support and other corresponding measures.The results show that the relocation time of all fully mechanized mining equipment in 1306 face is shortened by nearly 20 days,and the influence on mining face is reduced,and the safety during evacuation,transportation and installation is ensured.
作者 许鹏飞 Xu Pengfei(Jinneng Group Yuhuang Coal Industry Co.,Ltd.,Qinshui Shanxi 048200)
出处 《机械管理开发》 2020年第6期160-161,230,共3页 Mechanical Management and Development
关键词 快速搬迁 末采工艺 加强支护 快速安装 quick relocation final mining technology strengthening support quick installation
  • 相关文献

参考文献4

二级参考文献19

共引文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部