某钢箱梁桥整体顶升施工风险分析与控制 被引量:7

Risk Analysis and Control for Jacking Construction of a Steel Box Girder Bridge
下载PDF
导出
摘要 桥梁整体顶升是对既有桥梁的改造措施。每个案例可能采取不同的安全、技术措施,需要对桥梁顶升过程的风险进行针对性分析,并提出相应的风险解决与控制预案。结合一个大型钢箱梁桥整体顶升案例,分析了顶升过程中的关键风险,提出控制措施及实施方案。结合施工过程中的监测结果,证明了相关施工控制效果。研究成果对类似顶升工程有一定的指导意义。 Integral bridge jacking is areconstruction method to existing bridges.Ineach case,there are different safety and technical problems to be solved,hence it is necessary to analyze the risk of bridge jacking process andput forwardcorresponding risk solutions and control plans.Based on the case of the integral jacking of a large steel box girder bridge,the significant risks in the integral jacking process were analyzed,and the control measures and implementation planswere introduced.Combined with the monitoring results in the construction process,the construction control effectswere proved. Some guidance for similar jacking projects could be referred totheseresearch results.
作者 金明东 JIN Mingdong(Nantong Port and Navigation Development Center,Nantong 226000,China)
出处 《结构工程师》 北大核心 2020年第3期244-251,共8页 Structural Engineers
关键词 钢箱梁 整体顶升 风险分析 控制措施 integral jacking risk analysis control measures
  • 相关文献

参考文献7

二级参考文献15

共引文献70

同被引文献31

引证文献7

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部