摘要
华能福州电厂660 MW燃煤机组利用现有条件,在未进行技术改造的前提下,通过合理配煤、提前投运高加等方法将脱硝入口烟气温度提高到297℃,在并网前投入脱硝装置实现了运行。简要介绍了满足并网前投入脱硝装置可以采取的方法,供同类机组参考。
Based on the existing conditions of 660 MW coal-fired units,without technical transformation,Fuzhou Power Plant of Huaneng International Power Co.,Ltd.raised the flue gas temperature at the denitration inlet to 297℃by means of reasonable coal blending and putting into operation the high-pressure heater in advance,and put the denitration system into operation before grid connection.This paper briefly introduced the methods that can be adopted to put denitration device into operation before grid connection for reference of similar units.
作者
贾昌明
徐小艳
薛晓峰
卢熠然
JIA Changming;XU Xiaoyan;XUE Xiaofeng;LU Yiran(Fuzhou Power Plant,Huaneng International Power Co.,Ltd.,Changle 350299,Fujian,China)
出处
《能源与节能》
2020年第7期46-47,86,共3页
Energy and Energy Conservation
关键词
燃煤机组
SCR
脱硝技术
coal-fired units
SCR
denitration technology