摘要 连云港赣榆6号液化烃码头工程具有装卸液化烃的种类多、物性差异大、危险性高、工艺系统复杂等特点,针对上述特点,本文介绍了工作平台与系缆墩相结合的平面布置方案、工艺设计方案、工艺管道设计、低温丙丁烷工艺流程设计、低温液体收集池设置等,并在此工程中对码头控制室进行了抗爆设计,提升了码头安全水平。通过对本工程设计经验的总结,以期为我国液化烃码头工程的设计和建设提供借鉴与参考。 Liquefied Hydrocarbon terminal no.6 at Ganyu harbor of Lianyungang Port is characterized by many kinds of liquefied hydrocarbon products being loaded and unloaded,evident differences of physical properties,high risk,complex process system,etc.Thus the combination of working platform and cleats is considered in the design plans of plane layout,process,process pipeline,low-temperature propane&butane process,low-temperature liquid collection pool and etc.The anti-explosion design of control room is also made to improve safety level of the terminal.The experience in the project design is summarized to provide a reference for the design and construction of liquefied hydrocarbon terminals in China.
作者 李正武 云成 乔剑华 Li Zhengwu;Yun Cheng;Qiao Jianhua(Lianyungang Xinxu Port LPG Terminal Co.,Ltd.,Lianyungang Jiangsu 222113,China;CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China)
出处 《港工技术》 2020年第4期19-22,共4页 Port Engineering Technology
关键词 液化烃码头 平面 工艺 设计 liquefied hydrocarbon terminal general layout handling technology design
  • 相关文献

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部