期刊文献+

简析EPC模式下港口工程设计单位的风险防范 被引量:3

Discussion on Risk Prevention of Port Engineering Design Unit under EPC Mode
下载PDF
导出
摘要 设计单位为适应市场发展和与国际接轨需求,以其特有的为业主提供项目前端可行性研究阶段设计服务的优势,更容易深度参与业主项目策划,将项目策划为由设计单位作为牵头方的EPC联合体总承包模式,如何做好EPC模式下设计单位风险防范是值得研究探讨的。 In order to meet the needs of market development and international integration,with its unique advantages of providing design services for the owner in the feasibility study stage of the project front-end,it is easier to participate in the owner's project planning in depth.Taking the project planning as the EPC joint venture general contracting mode led by the design unit,how to do well in the risk prevention of the design unit under the EPC mode is worthy of study and discussion.
作者 魏小华 赵田 Wei Xiaohua;Zhao Tian(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China)
出处 《港工技术》 2020年第4期75-78,共4页 Port Engineering Technology
关键词 设计单位 EPC联合体 风险防范 design unit EPC consortium risk prevention
  • 相关文献

参考文献3

二级参考文献10

共引文献25

同被引文献14

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部